Nautorious Repair - Week 8

November 2002

Photos are courtesy of Andrew Dickinson at Jamestown Boat Yard

JBY Logo

Week 8

The rig needed a little work - the spreader tip cups were jammed. Actually, this did not work - they ended up using heat to remove the spreader tip cups.

Rigging

They have put the teak planks back on.

Hull 2

The refrigeration pump needed a little work. This picture and the next shows the accumulator, which has a pin hole.

Interior 1 Interior 2

The new accumulator, and the old one.

Interior 3

The refrigeration pallet.

Interior 4

The interior bulkhead has been put back together. This shot is from the refrigerator side.

Interior 5

This shot is from the pilot berth side.

Interior 6